Learn more about…
our domestic and international projects.
WSM Engineering Inc. offers a wide range of services to clients, including mechanical engineering across Ontario. Guided by a team of knowledgeable professionals, WSM Engineering has worked on projects large and small across Toronto, Ontario and the surrounding area.
Take a moment to read more about just a few of our selected projects below. No matter what our clients’ specific engineering needs were, we provided a wide range of services tailored to fit their needs perfectly. Download our full project list to learn more about our previous projects and technical achievements.
Vera M. Davis Centre Nursing Homes, 80, Allan Drive, Bolton:
Evaluation of existing heating, cooling and make up air systems with detail designing including new units for kitchen hood system and toilet exhaust system.
Tranquility Place, seniors’ residence (9 storey building)
Tollendale residence building for seniors (6 storey building)
Marriot Residence Inn, Graven Hurst (6 storey building)
Park Wood Mennonite Building, Waterloo (6 storey building)
Hampton Inn, Moncton (6 storey building)
Homewood Suites, London (6 storey building)
154A Christie Road Renovations, Toronto
30 Winonah Drive, Mississauga, ON
32 Alexis Road, North York, ON
11 Churchill Avenue, North York, ON
2000-2001Sheppard Avenue, North York, ON
515 Ann Avenue, Burlington, ON
28 Elmwood drive, Mississauga, ON
140 Blue Huron Ridge, Cambridge, ON
189 Springdale Boulevard, East York, ON
1387-1389 Dufferin Street, Toronto, ON
445 Winnett Avenue, Toronto, ON
58 Augusta Ave. Toronto ON M5T 2L9; Proposed Mixed Use Interior Renovation (Floor heating and plumbing)
361 Davenport Road, Infill Townhouses, Toronto, ON
Mixed Use Office-Restaurant Building, 1233 Woodbine Ave, Toronto, ON
Scope of work for M & E disciplines:
6. Green Standards Toronto and SB-10
Various locations in Canada:
Hotels typically having 120 suites, including unit package, furnaces, HRV, FAHU, kitchen hoods, laundry, swimming pools, dehumidifiers, exhaust fans and controls
Restaurants typically have smart kitchen hood system, package roof top units, ERV, FAHU, EF with air distribution system and controls including CO2 monitoring systems and plumbing works:
3570 Victoria Park Avenue Office Building, Toronto, ON
Scope of work for M & E disciplines:
IPEX OAKVILLE Building, U3-1425 North Service Road East, Oakville, L6M 2W2 Unit #1
Scope of work for M & E disciplines:
Jardin Belle Rive Building MOTEL, 2950 Laurier St. Clarence Rockland, ON
Scope of work for sprinkler system design permit disciplines:
Acceleration Business Campus Building, YEDI, 907 Alness Street, North York, ON
Scope of work for M & E disciplines:
7205 Goreway Drive, Westwood Mall Hair Salon, Mississauga ON
1390 Don Mills Road, now 16 Mallard Road, Pasta, North York Toronto, ON
416 Snack Bar, Toronto, ON
4450 Walker Road, Vietnamese Pho Restaurant, Windsor, ON
1193 Concession, Kingsville Mastronardi Winery, Windsor, ON
1025 THE QUEENSWAY COMPLEX, CINEPLEX, Etobicoke Toronto, ON
Godiva Chocolatier Shop in Shop HBC Queen Street
1655 Graven Hurst HWY22 MOTEL BUILDING RENOVATION, ON
1 Ross land avenue, Ajax., ON
Super 5 Inn at 2171, DUNDAS Street East, Mississauga
1705 Tech Ave unit 2 AMDOCS Office building, Mississauga Ontario
1055 Canada Place, Mississauga, ON; Units 112 & 113 Cancer Medical Centre for HVAC Final inspection
8611 Weston Road, Vaughan, ON; : Proposed Interior Renovation HVAC systems floor plans (2 levels) for two commercial units
26 Holtby Avenue, Brampton, ON; Offices under Client Doug McCullum
296 King Street East, Toronto, ON; Proposed Interior Renovation of Showroom
1760 Avenue Road, North York, ON – Multiple Use Non Residential, Showroom- Proposed HVAC systems floor plans (3 levels)
10 Maple grove Drive, The gardens of Edge mere, Town of Oakville, Halton, ON; HVAC design of Snow melting and Garage Ventilation Systems
3660 Hurontario Road, Mississauga, ON, HCC HOTEL UPGRADE FIRE PROTECTION SYSTEM
Scope of work for sprinkler system design permits disciplines:
Northwestern Memorial Hospital, Chicago:
Design based on Hartman Loop technology which is demand based control, VSD 3x800TR chillers, VFD CW VIL pumps, boilers, heat exchangers, cooling towers, all controlled by an integrated plant controller
Georgetown Guyana School USA:
Package consisting of IPC, VIL pump sets, Heat exchangers, pressure vessels, filters and piping work
Nuclear Safety Laboratory USA:
Package consisting of IPC, VIL pump sets, heat exchangers, pressure vessels, filters and piping work
Computer Data Centres USA:
Package consisting of IPC, Chillers, VIL pump sets, pressure vessels, filters and piping work, cooling towers, modular enclosure
St. Loyola School, Toronto assisted in the finalizing the HVAC, plumbing and fire protection drawings
St. Francis Xavier Elementary School, Brampton assisted in finalizing the HVAC drawings
Waterloo School of Optometry, Waterloo assisted in finalizing the HVAC and plumbing drawings
St. Marcellinus Secondary School, Toronto assisted in finalizing the HVAC and plumbing drawings
St-Thomas More School-2216, Lawrence Avenue East, Scarborough:
Boiler heating system condition assessment upgrading oil fired burners and boilers to gas fired types
Stephan Lea Cock Community Centre-2520, Birch Mount Road, Scarborough
Various Toronto District School Board projects
160 Sheppard Avenue, Medical Office Building, North York, ON
1. Proposed new work
2. Compliance of ASHRAE 62.1 ventilation minimum requirement of OBC
3. Green Standards Toronto and SB-10
600 Sherburne Street, Rosedale Medical Centre Building, Toronto, ON
8750 Jane Street, Office Building, Vaughan, ON
7379 Islington Avenue, First Hungarian Baptist Church, Woodbridge, ON
4110 Chess wood Drive, Korean Church, North York, ON
SE Markham Park - City of Markham ON, Water Service
156 Main Street, Grace Place Church, Brampton, ON
235 Mc Rae Drive, ABC Academy, Toronto, ON (Heritage Building)
1 Royal Orchard, North York, ON ( Assessment study)
3495 Confederation Parkway, CRISTO REI CHURCH, Mississauga, Ontario, L5B 3G5; Proposed Basement Washrooms Alteration and Renovation Upgrade - Mechanical Design service
Various locations in Canada:
Bruce Power Restart A, Kincardine
Walmart Supercentres across Canada having roof top units, exhaust fans, heat exchanger, water heaters, air distribution system and piping for plumbing and HVAC systems
Various Police/Fire/Ambulance Facilities
Offices/Administration Buildings including CO/NO2 detector systems in Toronto
Kingston-Nordex Mall at Kingston, Ontario
861 Cranberry Court, Industrial building Oakville, ON
181 Trade Valley Avenue, Industrial Truck Terminal, Vaughan, ON
326 Superior Blvd., Communications Data Repair Logistics, Mississauga
180 Healey Road, A& F Industries, Bolton, ON
131 East Drive, Cold Storage, Brampton
239 Station Street, U-Haul Ajax, Ajax, ON
79 Mountain view Road, Georgetown, Halton, ON; Warehouses units
Municipality of Clarington, Energy from Waste Plant, Covanta, Durham-York
Courtney Park Branch Library, Toronto assisted in the finalizing the HVAC, plumbing and fire protection drawings
Chinguacousy Park Power Services Upgrades, Brampton:
HVAC and plumbing system design and installation
Town Hall, Town of Oakville:
HVAC performance review and upgrade, report on it department design (computer data centre), replacement of make-up air unit, load simulations and verification as per the latest trends in IT rooms’ design. Review of the mechanical condition assessment, findings and prepared report of the existing HVAC equipment, supported with the HVAC load simulation in order to propose improvements/upgrades and recommendations with cost-effective solutions
Ourland and Sedgebrook Pools, Etobicoke:
Replacement of pool pumps, filtration system, chemical treatment, boiler, controls including old pipelines of water supply, drainage and electrical panel
Meadowvale 4 Ice Rinks, Mississauga:
Redesign, upgrade, replacement of existing HVAC units viz MAU, heaters, fans complete with gas piping. Rebalancing existing kitchen hood system
Father Ermanno Bulfon Community Center, City of Vaughan
1. Interior alteration existing building
2. Retrofit work / replacement
3. Proposed new work
4. Compliance of Ontario Fire Code
5. Compliance to SB-10 and green energy standards
SE Markham Park - City of Markham ON, Water Service
Al Zuwaiza Township, Sharjah assisted in the design of the plumbing system
12 Buildings for Crown Prince Department Groups-A & B 18 storey residential and retail buildings
H.E. Sh.Khalifa Bin Shkbout Al Nahyan Villas Abu Dhabi
Heirs of Late Mr. Soud Arar Al Dhahiri Building UAE 100000 SQM area 25 stories, 1-4 BD apartments, penthouse, basement, ground and two floors of offices in mezzanine. 300 x 5 TR of chillers
H.H. Sk. Mohammad Bin Khalifa Al Nahyan Building UAE
Fatima Khoury Villas UAE
H.E. Sk. Khalifa Bin Shakbout Al Nahyan Building UAE
H.E. Sh.Khalifa Bin Shkbout Al Nahyan Villas UAE
H.E. Hamooda Bin Ali Villa & Majliss UAE
Beniyas Tower 25 storey building, 2BR and 3 BR condominiums with 2 level penthouses
4 Private Villas for Sheikh Zayed Al Nahyan Abu Dhabi, UAE
H.E.Sheikh Mohammed Bin Butti Palaces Complex Abu Dhabi consisting of meeting rooms, guest rooms, kitchens, mosque, staff quarters, watch room, grand entrance, irrigation in an area of 5 sq. km.
The New Health Club-Intercontinental Hotel, Abu Dhabi consisted of whirlpools, sauna, gym, spectator stand for squash courts, washrooms, swimming pools, changing rooms, lockers
Renovation of Hotel, Capracino, Italy
Intercontinental Hotel, refurbishing suites in Abu Dhabi
Intercontinental Hotel: renovation and extension Abu Dhabi
Electromechanical systems were replaced in phases
B2B Hotel Project, Abu Dhabi assisted in the design of plumbing system
Hyde Park Hotel, London UK:
Design based on Hartman Loop technology, IPC for VFD 3x1500KW chillers, VFD and VIL primary/secondary/condenser pumps, geothermal heat pumps, and adiabatic air condensers using humidifiers and all controlled by an integrated plant controller
Al-Zahra Hospital, Dubai:
Project consisted of around 200 beds and 25 wards and 7 floors. A few features of this project are meeting the supply air changes per hour, outdoor air changes per hour to the various rooms, design for specified indoor conditions, pressure relationship to adjacent rooms. HEPA filters of efficiency greater than 99.97%. Variable air volume systems and heat recovery units were specified for energy conservation purpose. Chillers, air handlers, cooling tower and fresh air handlers, chilled water pumps were other features in this project. HVAC design was based on ASHRAE HVAC design manual for hospitals and clinics and ASHRAE 90.1 and 62 and energy-efficient design.
Al-Zahra Hospital, Sharjah assisted in the design of the plumbing system
Al Wahda Club, National Sports Centre and Residential & Office Buildings
Canadian Chancery Abu Dhabi
Rehabilitation Centre, Dubai
Centre for Disabled, Dubai
Lebanese Embassy, Abu Dhabi
Choiefat School Complex, Beirut
Several Schools at various locations
Existing Chemical Industrial Facility, New York, USA
Al Masaood Office Building consisted of 125,000 sq. meter area 25 stroeys all offices, 2 penthouses, 3 basements for underground parking and 2 mechanical room floors, ground and mezzanine floors for Nissan car showroom and aircraft helipad on roof. 400×5 TR chillers
Nissan Showroom, Mussaffa
Toyota Showroom, Mussaffa
Abu Dhabi Prison Complex having 4 sq. km. area having several prison rooms, large kitchen and laundry, computer centre, ladies’ prison, washrooms, workshop, visitor’s hall, hostel for police, offices, and cold rooms, watch towers
Al-Wahda Sports Stadium consisting of bowling alley, basketball courts, tennis courts, spectator stand, auditorium, cafeteria and video games
Abu Dhabi Automatic Slaughter House consisted of several cold store rooms, refrigeration plan run on ammonia and glycol
Abu Dhabi Main Bus Terminal, includes maintenance contract, Abu Dhabi
Various Places of Worship
H.E. Sheikh Mohammed Bin Butti Palaces Complex Abu Dhabi consisting of meeting rooms, guest rooms, Kitchens, mosque, community halls, staff quarters, watch room, grand entrance, irrigation in an area of 5 sq. km.
Several Mosques at various locations in UAE
For more information or to speak directly with the WSM Engineering team, contact us today.